Completing work on Groningen pumping stations

20170912 110709 Resized 845x321

Almost a year after signing the contract, work is now being completed on the last of the nine pumping stations. The sewerage pumping station at Bedum will be fitted with new pumps with associated piping and controls.

Pictured removing the wind boilers.

Share this piece

Perhaps also something for you
Double Arrow Left
Double Arrow Right
Contact us
Icon Wastewater
Landustrie Sneek Water Management
Landustrie Sneek Pumping Plant
Landustrie Sneek Hydropower