Skip to content
  • Go to Noardling
  • Phone Flip 1
    +31 (0)515 486 888
  • Envelope Dot (1) 1
    info@noardling.nl
en_GB EN
en_GB EN nl_NL NL de_DE DE
Site logo
  • Vacancies
  • Landustrie
  • Products
    • Wastewater
    • Sewage pumps
    • Water management
    • Hydropower
  • Projects
    • Wastewater
    • Sewage pumps
    • Water management
    • Hydropower
  • News
  • Contact

en

  • Home
  • en
Renovation of Doorn 3 sewage pumping stations

Renovation sewerage pumping stations Doorn

Landust renovated three sewage pumping stations in Doorn for the municipality of Utrechtse Heuvelrug. New LANDY pumps were supplied and installed for the pumping stations on Oranjelaan, Breullaan and Horstlaan, together with the associated piping and controls.
Double Arrow Right
New control 650 pumping stations

New controls for 650 pumping stations

With the demise of Cicruit Switched Data (CSD) dial-up technology, Municipality of Koggenland was forced to find another communication solution for its 650-plus sewer pumping stations. To this end, the control systems had to be converted to be ready for a future focused on the 4G network.
Double Arrow Right
Adaptation Polder pumping stations 1

Modification of polder pumping stations

In mid-2019, Landustrie was awarded the extensive contract by Van Boekel Bouw & Infra to carry out all mechanical engineering works of a total of four polder pumping stations, located in the Rijnland Water Board. For the replacement of the three existing pumping stations in the Veerpolder, Oosteinderpolder and Hellegatspolder, a new Landy auger was delivered and assembled, including a new drive unit.
Double Arrow Right
Three Hundred Minerals Renovated

Three hundred mini-grids renovated

On Thursday 9 November 2020, the renovated 300 mini pumping stations commissioned by the Municipality of Leusden went into operation. Working closely with social employment service Amfors Groep, Landustrie renovated the controls of these mini pumping stations in the municipality. On the basis of demo cabinets supplied by Landustrie, Amfors' metal company (Metafors) realised the switchboxes and the corresponding outdoor installation cabinets. Old switchboxes were dismantled by them and carefully separated, checked and recycled where possible. The proceeds from the recycling were donated to KiKa.
Double Arrow Right
Last Diesel pumping station replaced 1

Last diesel pumping station replaced

Wetterskip Fryslân's last diesel pumping station has been replaced by a sustainable pumping station, equipped with a Landy prefabricated screw installation. Commissioned by De Boer & De Groot, Landustrie took care of the entire electromechanical part. The Wildlanden polder pumping station, located near Oudega (Smallingerland) is now equipped with a prefabricated screw pump, diameter 1100 mm, length 3800 mm and capacity of 960 m3/hour.
Double Arrow Right
Img 0384

CSD technology disappears; what are the implications?

In the very near future, the dial-up technology Circuit Switched Data will no longer be supported. KPN will start the phase-out as early as 1 January 2021 and other providers will follow in the foreseeable future.
Double Arrow Right
Renovation of Sneek ice rink pumping station 1

Renovation pumping station Ice rink Sneek

The municipality of Súdwest-Fryslân commissioned Landustrie to renovate the IJsbaan pumping station in Sneek. The pumping station on the Leeuwarderweg dates from 1965 and was also built by Landustrie at the time.
Double Arrow Right
Country12 495x400

Safety first

Safety remains paramount. After an in-house course, all our employees in Production and Field Services hold the Safe Hoisting and Lifting/Tightening of Loads certificate. Not only was a practical exam taken, but all legal safety regulations and procedures were also covered.
Double Arrow Right
Stainless steel jacks on the way to Canada 1

Stainless steel jacks on their way to Canada

To treat industrial wastewater, three Landy augers have been shipped to Vancouver, Canada. After arriving at the port, the augers will continue by road to British Columbia. The augers are over 2 metres in diameter and up to 14.5 metres long.
Double Arrow Right
Renovation of Piet Oberman polder pumping station

Renovation of Piet Oberman polder pumping station

Commissioned by the Zuiderzeeland Water Board, Landustrie is renovating the Piet Oberman polder pumping station in Tollebeek. The open screw pump dating from the 1970s will be fitted with new parts and converted from a grease-lubricated to a water-lubricated pump. The non-return valves and control box will also be renewed.
Double Arrow Right
Creusabro

Screw applied in silos

For ESI Eurosilo at Purmerend, Landustrie has delivered a total of 35 pieces of fearsome-looking jacks, or transport screws, in 2019 and 2020. A striking feature of the jacks is the serrated shoring edge and the material used, namely Creusabro 4800.
Double Arrow Right
Helsingborgrecolab1

WWTP RecoLab Helsingborg

The new Oceanhamnen district in Helsingborg, Sweden, will use decentralised wastewater treatment. With Desah BV's innovative sanitation concept, grey and black water will be collected and processed separately. This concept contributes to the reuse of water, nutrients and energy.
Double Arrow Right
  • Page 1
  • Page 2
  • Page 3
  • Next page »
Slice 1

Noardling B.V.

PO Box 199
8600 AD Sneek

  • Noardling B.V.

    PO Box 199
    8600 AD Sneek

Visiting address

Pieter Zeeman Street 6
8606 JR Sneek

  • Visiting address

    Pieter Zeeman Street 6
    8606 JR Sneek

Contact

T +31 515 486 888
E info@noardling.nl

  • Contact

    T +31 515 486 888
    E info@noardling.nl

Follow us

© 2025 Landustrie
  • Sitemap
Website developed by MediaSoup