WWTP Hildesheim (D)
We renovated the inlet pumping station of the Hildesheim sewage treatment plant in Germany. Two new Landustrie jacks with a prefabricated trough installed. Of the screw pumps in this pumping station, one screw must be ready for operation at all times. A quick conversion was possible because the selected semi-packaged trough has a very short installation time. The newly delivered augers have a diameter of 2.6 m and a length of 13 m.