WWTP Everstekoog (NL)
As subcontractor to VBK Hoorn, Landustrie supplied the mechanical engineering works (4th phase) for WWTP Everstekoog in De Koog on Texel.
These included the belt filter plant, the polymer make-up and dosing plant, the air compressor plant and the underwater mixer in the thickened sludge buffer.
New pumping units were delivered for the De Koog sewage pumping station, for the return sludge pumping station, and for the site sewage system.
Newly delivered are also:
rake grid
grid material washing press
mixers sand trap/anaerobic tank/selector/anoxic chamber
propellers
aeration system/blowers
sludge dredger with cleaning bridge
various pumps with piping and fittings
lifting facilities