Landustrie has delivered the full renovation of Markerkant pumping station on behalf of the Dutch water board “Zuiderzeeland”. The pumping station, built in 2000, now is equipped with dry-installed pumps with a capacity of 1200 m3/h. Renovation was necessary in order to meet the newest techniques. Work carried out has included electromechanical and civil works. Landustrie supplied two new pumps, each with a capacity of 110 kW. These pumps have been tested at our in-house test faciility in Sneek, a fully equipped test tank for pumps of any make.