New controls for 650 pumping stations

New Control 650 Ground 845x321

With the demise of Cicruit Switched Data (CSD) dial-up technology, Municipality of Koggenland was forced to find another communication solution for its more than 650 sewerage pumping stations.
To this end, the control systems are being converted to be ready for a future focused on the 4G network.

Landustrie was commissioned by Municipality of Koggenland to provide the installations with a new modem where possible or to replace the existing Landy-Line systems with Landy-Lite where necessary.

The Landy-Lite is a new alarm and monitoring system especially for pressure sewers that can be quickly and easily mounted in outdoor boxes.

YP Your Partner from Drachten provided connection of the sewage pumping stations to the new CARS.8 main station.

Share this piece
Perhaps also something for you
Double Arrow Left
Double Arrow Right
Contact us
Icon Wastewater
Landustrie Sneek Water Management
Landustrie Sneek Pumping Plant
Landustrie Sneek Hydropower