In mid-2019, Landustrie was awarded the extensive contract by Van Boekel Bouw & Infra to carry out all mechanical engineering works of a total of four units polder pumping stations, located in the Rhineland Water Board.

For the replacement of the three existing pumping stations in the Veerpolder, Oosteinderpolder and Hellegatspolder, a new Landy auger was delivered and installed, including a new drive unit.
After completion, the new pumping stations will meet current technical and safety requirements.

The Oude Secretarie box pumping station, near Hoofddorp, located in the Haarlemmermeerpolder, was fitted with a new automatic grate cleaner installation. No new augers were installed here, but the existing ones were overhauled by Landustrie. In the production halls in Sneek, the augers were blasted and linted. This process restored the original diameter of the auger.

Furthermore, the augers were fitted with a new Landy lower and upper bearing, as well as new drive and motor.

Share this piece
Share this piece
Double Arrow Left
Double Arrow Right
Contact us
Icon Wastewater
Landustrie Sneek Water Management
Landustrie Sneek Pumping Plant
Landustrie Sneek Hydropower