Hydropower jack in unique location
With the first major transport in the new year 2022, a prefab Landy hydropower auger on its way to France. The mortar will be used by ER3i, Landustrie's French partner, are being installed in a very special location. In Guérigny, located on the Nièvre river are the historic royal forges, les Forges Royales, dating back to the 17th century. The auger is designed as a compact unit (prefabricated), which speeds up installation considerably.