Skip to content
  • Go to Noardling
  • Phone Flip 1
    +31 (0)515 486 888
  • Envelope Dot (1) 1
    info@noardling.nl
en_GB EN
en_GB EN nl_NL NL de_DE DE
Site logo
  • Vacancies
  • Landustrie
  • Products
    • Wastewater
    • Sewage pumps
    • Water management
    • Hydropower
  • Projects
    • Wastewater
    • Sewage pumps
    • Water management
    • Hydropower
  • News
  • Contact
  • Home
  • Author: Landustrie
  • Page 3
Adaptation Polder pumping stations 1

Modification of polder pumping stations

In mid-2019, Landustrie was awarded the extensive contract by Van Boekel Bouw & Infra to carry out all mechanical engineering works of a total of four polder pumping stations, located in the Rijnland Water Board. For the replacement of the three existing pumping stations in the Veerpolder, Oosteinderpolder and Hellegatspolder, a new Landy auger was delivered and assembled, including a new drive unit.
Double Arrow Right
Three Hundred Minerals Renovated

Three hundred mini-grids renovated

On Thursday 9 November 2020, the renovated 300 mini pumping stations commissioned by the Municipality of Leusden went into operation. Working closely with social employment service Amfors Groep, Landustrie renovated the controls of these mini pumping stations in the municipality. On the basis of demo cabinets supplied by Landustrie, Amfors' metal company (Metafors) realised the switchboxes and the corresponding outdoor installation cabinets. Old switchboxes were dismantled by them and carefully separated, checked and recycled where possible. The proceeds from the recycling were donated to KiKa.
Double Arrow Right
Stainless steel jacks on the way to Canada 1

Stainless steel jacks on their way to Canada

To treat industrial wastewater, three Landy augers have been shipped to Vancouver, Canada. After arriving at the port, the augers will continue by road to British Columbia. The augers are over 2 metres in diameter and up to 14.5 metres long.
Double Arrow Right
South And Northinderpolder pumping station.1 495x400

Auger pumping station 100% fish-friendly

Reports from TAUW show that the Fishtrack2.0 as applied in the screw pumping station at Usquert is an excellent fish migration facility. Both upstream and downstream, over 1,200 pangolins and eels already migrated in both directions at the test site in 2 weeks. And 100% undamaged, as they do not pass through any rotating parts in the pumping station. Meanwhile, large eels, silver eels and pikeperch also passed.
Double Arrow Right
Exhibition Logo With Date Png

Aquatech Amsterdam 2023

From Monday 6 to Thursday 9 November 2023, we will be at the international water trade fair the Aquatech Amsterdam in the RAI. You will find us here at stand no 07-320 in the Holland Pavilion.
Double Arrow Right
Slice 1

Noardling B.V.

PO Box 199
8600 AD Sneek

  • Noardling B.V.

    PO Box 199
    8600 AD Sneek

Visiting address

Pieter Zeeman Street 6
8606 JR Sneek

  • Visiting address

    Pieter Zeeman Street 6
    8606 JR Sneek

Contact

T +31 515 486 888
E info@noardling.nl

  • Contact

    T +31 515 486 888
    E info@noardling.nl

Follow us

© 2025 Landustrie
  • Sitemap
Website developed by MediaSoup