Warburg WWTP

Landustrie received an order from Stadt Warburg (D) in late 2022 for the refurbishment and renovation of the screw pumping stations at the Warburg and Daseburg sewage treatment plants.
At the Warburg WWTP, located in the Diemel Valley, the existing intermediate pumping station was equipped with three new Landy screw pumps. This pumping station pumps the return sludge from the three post-sedimentation tanks. All three screw pumps are equipped with a compact screw trough in a self-supporting construction. We also provided the complete drive system.
Also, the intermediate pumping station at WWTP Warburg was upgraded with two new Landy Archimedes screw pumps, also in compact design. This pumping station pumps return sludge at the sewage treatment plant.
The dismantling of the existing and mounting of the new screws had to take place while the plant remained in operation. The screws were taken out of service and replaced successively, within an eight-hour specification. All this during a period of dry weather.