Skip to content
  • Go to Noardling
  • Phone Flip 1
    +31 (0)515 486 888
  • Envelope Dot (1) 1
    info@noardling.nl
en_GB EN
en_GB EN nl_NL NL de_DE DE
Site logo
  • Vacancies
  • Landustrie
  • Products
    • Wastewater
    • Sewage pumps
    • Water management
    • Hydropower
  • Projects
    • Wastewater
    • Sewage pumps
    • Water management
    • Hydropower
  • News
  • Contact

September 2017

  • Home
  • Year: 2017
  • Month: September
20170912 110709 Resized

Completing work on Groningen pumping stations

Almost a year after signing the contract, work is now being completed on the last of the nine pumping stations. The sewerage pumping station at Bedum will be fitted with new pumps with associated pipework and controls.
Double Arrow Right
Dji 0042 01 845x321

Steinsau hydroelectric weirs

Meanwhile, LANDY hydropower jacks have been installed in the existing weir, in the River Ill near Erstein. A total of six augers, each with a diameter of 2.5 metres and a weight of 7 tonnes, will produce about one million kWh per year. This amount of renewable energy is good for about 250 households.
Double Arrow Right
Slice 1

Noardling B.V.

PO Box 199
8600 AD Sneek

  • Noardling B.V.

    PO Box 199
    8600 AD Sneek

Visiting address

Pieter Zeeman Street 6
8606 JR Sneek

  • Visiting address

    Pieter Zeeman Street 6
    8606 JR Sneek

Contact

T +31 515 486 888
E info@noardling.nl

  • Contact

    T +31 515 486 888
    E info@noardling.nl

Follow us

© 2025 Landustrie
  • Sitemap
Website developed by MediaSoup