Skip to content
  • Go to Noardling
  • Phone Flip 1
    +31 (0)515 486 888
  • Envelope Dot (1) 1
    info@noardling.nl
en_GB EN
en_GB EN nl_NL NL de_DE DE
Site logo
  • Vacancies
  • Landustrie
  • Products
    • Wastewater
    • Sewage pumps
    • Water management
    • Hydropower
  • Projects
    • Wastewater
    • Sewage pumps
    • Water management
    • Hydropower
  • News
  • Contact

November 2016

  • Home
  • Year: 2016
  • Month: November
Landustrie Sneekermeer 1

Major hydro project in Alsace

The existing Steinsau weir on the River Ill near Erstein is being fitted with six pieces of LANDY hydropower jacks. The weir dates from the late 19th century and ensures that the downstream regions of Erstein and Strasbourg are not flooded during high water. Part of the restoration and renovation of the weir is the installation of screw turbines to generate renewable energy.
Double Arrow Right
Sint Michielsgestel10a

Hydroelectric power station opening

Last Saturday, the Netherlands' first cooperative hydropower plant was festively opened. Amid great interest, the children's mayor and the youth water digger activated the hydropower auger. After the official part, there was an open house for all interested parties. A special Dommelstroom app was developed for the plant, which provides real-time insight into energy production.
Double Arrow Right
Slice 1

Noardling B.V.

PO Box 199
8600 AD Sneek

  • Noardling B.V.

    PO Box 199
    8600 AD Sneek

Visiting address

Pieter Zeeman Street 6
8606 JR Sneek

  • Visiting address

    Pieter Zeeman Street 6
    8606 JR Sneek

Contact

T +31 515 486 888
E info@noardling.nl

  • Contact

    T +31 515 486 888
    E info@noardling.nl

Follow us

© 2025 Landustrie
  • Sitemap
Website developed by MediaSoup