Hydropower auger Sint-Michielsgestel assembled
On Tuesday 13 September 2016, the Landy hydropower auger for Energiecoöperatie Dommelstroom arrived in Sint-Michielsgestel. Amid great public interest, the trough and auger were assembled on site at the existing weir.