Skip to content
  • Go to Noardling
  • Phone Flip 1
    +31 (0)515 486 888
  • Envelope Dot (1) 1
    info@noardling.nl
en_GB EN
en_GB EN nl_NL NL de_DE DE
Site logo
  • Vacancies
  • Landustrie
  • Products
    • Wastewater
    • Sewage pumps
    • Water management
    • Hydropower
  • Projects
    • Wastewater
    • Sewage pumps
    • Water management
    • Hydropower
  • News
  • Contact

2016

  • Home
  • Year: 2016
Img 20161207 Renovation sewerage pumping stations Signature 2 02

Renovation of nine pumping stations

At the main Groningen sewerage pumping station, the Water Board and Landustrie signed the agreement to renovate nine pumping stations on Wednesday 7 December 2016. The sizeable order of more than one million euros includes not only carrying out the renovation work, but also a three-year management and maintenance plan is part of the order.
Double Arrow Right
Landustrie Sneekermeer 1

Major hydro project in Alsace

The existing Steinsau weir on the River Ill near Erstein is being fitted with six pieces of LANDY hydropower jacks. The weir dates from the late 19th century and ensures that the downstream regions of Erstein and Strasbourg are not flooded during high water. Part of the restoration and renovation of the weir is the installation of screw turbines to generate renewable energy.
Double Arrow Right
Sint Michielsgestel10a

Hydroelectric power station opening

Last Saturday, the Netherlands' first cooperative hydropower plant was festively opened. Amid great interest, the children's mayor and the youth water digger activated the hydropower auger. After the official part, there was an open house for all interested parties. A special Dommelstroom app was developed for the plant, which provides real-time insight into energy production.
Double Arrow Right
St Michielsgestel Transport

Hydropower auger Sint-Michielsgestel assembled

On Tuesday 13 September 2016, the Landy hydropower auger for Energiecoöperatie Dommelstroom arrived in Sint-Michielsgestel. Amid great public interest, the trough and auger were assembled on site at the existing weir.
Double Arrow Right
Duelkener Nette1

Auger pumping station Dülkener Nette officially in operation

The auger pumping station at Viersen was officially opened on 29 June 2016. The new supply pumping station is equipped with five Landustrie augers and is used to pump the excess rainwater from the buffer canal into the new buffer basin (6400 ltr/sec). This prevents the surface water from being overloaded with polluted water. In filter basins planted with grass, the water is cleaned and returned to the Nette river in small quantities.
Double Arrow Right
Leader award 2016

Landustrie wins frontrunner award

After participating in the Koploper project in the Municipality of Weststellingwerf, Landustrie emerged as the winner. In the Koploper project, companies are screened for sustainability. A Koploper project lasts about a year and is concluded with a Koploper symposium. There, the Koplopers present their results and inspire other companies. The participant who has best completed the CSR homework assignment wins the Koploper Award!
Double Arrow Right
Dsp22 07

Lightweight Wetterfretter

Landustrie's renowned dirt cutting Wetterfretter pumps are now also available in a compact and lightweight version. By adapting the pump and motor housing, a compact pump has been realised with a weight of only 35 kg. In case of inspection or maintenance, the pump can easily be lifted by hand. Especially at mini pumping stations where no lifting facility is available, this pump offers a solution.
Double Arrow Right
Slice 1

Noardling B.V.

PO Box 199
8600 AD Sneek

  • Noardling B.V.

    PO Box 199
    8600 AD Sneek

Visiting address

Pieter Zeeman Street 6
8606 JR Sneek

  • Visiting address

    Pieter Zeeman Street 6
    8606 JR Sneek

Contact

T +31 515 486 888
E info@noardling.nl

  • Contact

    T +31 515 486 888
    E info@noardling.nl

Follow us

© 2025 Landustrie
  • Sitemap
Website developed by MediaSoup